Complete Late Model Fabricating Facility - Rabin Worldwide

,

Complete Late Model Fabricating Facility

  • Hunstville, Alabama
  • Auction On Site & Online
AUCTION COMPLETED

Complete Late Model Fabricating Facility

8 Million Pounds of New Stainless & Carbon Steel

All Equipment New in 2007 & 2008 – Only One Year in Operation 

Highlights:

  • 2007 Mazak 3D Fabri Gear 150 tube & pipe 6 axis laser cutting machine
  • 2007 Mazak Super-Turbo X-48MKII plate laser cutting machine
  • 2008 Ocean Hyd.-Mech DCM-18 Dual Column Dual Miter Band Saw
  • 2008 Mighty Viper Pro-2150AG CNC VMC
  • 2008 BLM CNC pipe bender with Integrated CMM table
  • 2008 North Star Imaging 3 Axis Real Time X-Ray
  • 2008  Paint Booth Technologies 16′ x 60′ x 13.5′ high cross draft drive through paint spray booth
  • (30) 1/4 Ton to 10 Ton Overhead Bridge Carnes with (16) Crane Ways
  • Orbital Welders, Circle Welders, Wire Feed and Stick Welders with Booms
  • Stainless and Carbon Steel Dip Tank Type Cleaning System

Plus:

Over 8 Million Pounds of New ASTM Stainless and Carbon Steel Inventory

Wednesday, July 23rd
Starting at 10:00 am

USEC Facility
South Point Business Park
5951 Endeavor Way, Tanner, AL 35071

Inspect Tuesday, July 22nd
from 9 am to 4 pm

Contact Information.

Online bidding at bidspotter.com